De Wijngaard

Construction of two buildings with a total of 75 adapted housing units for people with reduced mobility (PRM), a post-revalidation medical block and two basement car parks.
Wijngaardstraat à 3560 Lummen

Property OwnerLUMMEN
FloorsG+3
Overground surface7.818 m²
Basement surface 2.016 m²
Flats number 75
Download project infos See on a map